I added water filter and bypass (while cooling). I added a couple of drains for the lines, and I have a new idea about the "output towers". While your two valves per tower is simple and straightforward - I'm thinking it might be overkill. It's just a flexible tubing routing issue at that point. I have one valve per output - but here is the deal - I want to put them right next to each other, spaced just wide enough for the handles to operate. Then I can put some vertical pins on the end of the handle - and drop on a little bar that will connect the two (removable). That way the two handles will work in tandem (flow rate sync - DONE!) during the sparge. I also am not sure about the benefit of the tower itself - I might just plumb them right in the front of the base and use flexible tubing to get anywhere I need to.... thoughts?
I do like the inline thermometer on the wort line, I might put one on the water line, too.
Mylo




