A year of wishing, dreaming, and planning has come to an end. She's operational. I wouldn't say complete, but operational. I'm going to pop her cherry next weekend. I still need to insulate all the copper. The control panel is spartan and temporary. A couple of PIDs, and some pretty sophisticated circuitry is forthcoming. She can fit not only sankeys, but eventually either the 10 or 20Gs from B3.
Don't hate me cuz she's beautiful....
http://s262.photobucket.com/albums/ii12 ... mview=grid
Mylo




